As the wheel has developed roads have also changed.
Every improvement in transport, especially roads creates more and more demands by the users.
Heavier loads have to be transported on faster and faster roads. Today roads extend over almost every terrain.
Day after day, year after year they have to withstand increased stress and strain. This is let to the modern road construction industry and high demands in engineering together with increased demands in material and machinery. And this is the other side of the coin: the costs and the adverse effects at the environment are enormous. The most important of all imposed loads on earth are foundations.
That is why we use soil stabilizer UPD - a material that creates an interchange of ions. UPD covers a wide field in the construction sector beside road-construction. Roads remain firm and they compact still further so that after years of warranty they free from substance and don’t require repair.
Treated compacted soil is also harmless to the environment. And no residues are left to be washed away.
A road or any other civil engineering project which is constructed using UPD is frost proof and therefore save for a long time.
You can construct faster with soil stabilizer UPD - because of reducing of constructing time, transport and labor.
UPD constructions are more stable than traditional matters thanks to the ion interchange actions.
Finally with UPD roads can be constructed using simple equipment.
Saves Time, Money, and Natural Resources
60 to 70% Savings Over Lime
Use Lower Quality Local Base Or In-Place Material
Soil stabilizer UPD is a Green Product that saves fuel, labor and water. It also has much less impact on the environment than does Portland cement and lime. The manufacture of UPD requires no mining, hauling, crushing or high energy kiln fires. No dust particulate or greenhouse gases are released into the air during the manufacture or installation of UPD.